Product Categories
Project Name: Two 630kW/1354.8kWh User-Side Distributed Energy Storage Projects for Yuda Jewelry & Accessories Manufacturing Co., Ltd. Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Chow Tai Fook Jewelry Plant in Foshan Installed Capacity: 1.25MW/2.71MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 2 × 1.354MWh), PCS (2 × 630kW) Project Status: Connected to the grid and put into operation in May 2023
Project Name: Yuanqi 3MW Energy Storage System Test Bench Project Type: Energy Storage System Test Bench Project Location: Suzhou City, Jiangsu Province Installed Capacity: 3MW Main Equipment Model: PCS (1725kW High-Power, 200kW String-Type) Project Status: Commissioned in April 2023
Project Name: Ruiyang Gas Power Generation Project in Xiyang County, Jinzhong City, Shanxi Province Project Location: Jinzhong City, Shanxi Province Installed Capacity: 1.25 MW / 1.39 MWh Project Features: User‑side energy storage, hybrid power generation, peak‑valley arbitrage through load shifting to smooth out demand peaks and valleys, and auxiliary support for hybrid power system operation. Project Configuration: Batteries (Lithium Iron Phosphate, 1.39 MWh), PCS (2 × 630 kW) Project Status: Connected to the grid and put into operation in April 2023
Project Name: China National Aviation Information Group Cloud Data 1.25 MW/2.23 MWh Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Jiaxing City, Zhejiang Province Installed Capacity: 1.25 MW / 2.23 MWh Energy Storage Configuration: Non-Enclosed Energy Storage Container Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 2.23 MWh), PCS System (1.25 MW) Project Status: Connected to the grid and put into operation in April 2023
Project Name: Wuhan Topu Park PV–Storage–Charging Project Project Type: Photovoltaic Carport + Energy Storage + Charging Piles Project Location: Wuhan City, Hubei Province Installed Capacity: 100 kW / 200 kWh Benefit Generation: Generating electricity via photovoltaic power and feeding it into the grid; using energy storage to shave peaks and fill valleys, thereby smoothing power output. Major Equipment Brands and Models: Batteries (Lithium Iron Phosphate 0.5C cells, Haichen), PCS (Migre Energy, 1 x 100 kW) Project Status: Connected to the grid and put into operation in December 2022
Project Name: CAS Liquid-Cooled Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Qingyuan Pumped Storage Power Station, Guangzhou City, Guangdong Province Installed Capacity: 0.2 MW / 1.25 MWh Energy Storage Configuration: Energy Storage Container Benefit Generated: Serves as a backup power source Main Equipment Model: Batteries (302 Ah Lithium Iron Phosphate Cells at 0.5C) Project Status: Connected to the grid and put into operation in November 2022
Project Name: Zhejiang Hongbo 100kW/206kWh Energy Storage System Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Shaoxing City, Zhejiang Province Installed Capacity: 100kW/206kWh Energy Storage Configuration: Outdoor Battery Cabinet Benefit Generation: By feeding photovoltaic power into the grid and utilizing energy storage to smooth peak loads and fill valleys Main Equipment Model: Batteries (Lithium Iron Phosphate, 0.5C) Project Status: Connected to the grid and put into operation in October 2022
Project Name: Mengxi Haren Power Plant 9 MW/4.5 MWh AGC Frequency Regulation Energy Storage Project Project Location: Within the premises of Mengxi Haren Power Plant Installed Capacity: 9 MW / 4.5 MWh Project Features: Combined Secondary Frequency Regulation Using Thermal Power Plant Generators and Energy Storage, Participating in the Grid Ancillary Services Market Project Configuration: Batteries (Lithium Iron Phosphate), PCS (3000 kW) Project Status: Connected to the grid and put into operation in June 2020