YUANHE
Product Center

Make electricity cleaner, make energy smarter.

VIEW MORE
scroll down



Project Name: New Zealand Energy Storage Battery Cabinet Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: New Zealand Installed Capacity: 200 kW / 430 kWh Energy Storage Configuration: Outdoor Battery Cabinet Project Features: Integrated with a fast-charging system to mitigate the impact on and reliance of the power grid caused by fast charging, thereby accelerating the deployment of New Zealand’s fast-charging network. Benefit Generation: Peak‑valley arbitrage through load shifting to smooth out electricity demand. Main Equipment Model: Battery System (Lithium Iron Phosphate, 2 × 215 kWh, 0.5C) Project Status: August 2024


Project Name: Huzhou Shengji Titanium Industry 1.5 MW/3 MWh User-Side Energy Storage Project Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Shengji Titanium Industry Energy Storage Station Area, Huzhou, Zhejiang Installed Capacity: 1.5 MW / 3 MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 14 x 215 kWh), PCS System (1.5 MW) Project Status: Connected to the grid and put into operation in June 2024


Project Name: Jiangsu Guoyue 1.25 MW/2.4 MWh Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Liyang City, Jiangsu Province Installed Capacity: 1.25 MW / 2.4 MWh Energy Storage Configuration: Energy Storage Container Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Model: Batteries (0.5C Lithium Iron Phosphate 280 Ah Cells), PCS (1250 kW) Project Status: Delivered


Project Name: South Africa HP2 Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: South Africa Installed Capacity: 300 kW / 654 kWh Energy Storage Configuration: Outdoor Battery Cabinet Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Model: Batteries (Lithium Iron Phosphate) Project Status: Connected to the grid and put into operation in May 2024


Project Name: Kepler Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Foshan City, Guangdong Province Installed Capacity: 100 kW / 215 kWh Energy Storage Configuration: Outdoor Battery Cabinet Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Batteries (Lithium Iron Phosphate, 0.5C), PCS (100 kW) Project Status: Connected to the grid and put into operation in May 2024


Project Name: ChengTou Photovoltaic–Energy Storage–Charging HP2 Battery Outdoor Cabinet Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Xinglong Cultural Park, Yanzhou District, Jining City Installed Capacity: 100 kW / 215 kWh Energy Storage Configuration: Battery Outdoor Cabinet Benefit Generation: In conjunction with photovoltaic systems and charging stations, the project leverages time-of-use electricity pricing to capture peak‑valley arbitrage opportunities. Main Equipment Models: Battery System (Lithium Iron Phosphate, 215 kWh), PCS System (100 kW) Project Status: Connected to the grid and put into operation in May 2024


Project Type: Combined Frequency Regulation with Coal-Fired Power Plant and Energy Storage Project Location: Datang Lubei Power Generation Co., Ltd. Plant Area, Wudi County, Binzhou City Installed Capacity: 9 MW / 5 MWh Energy Storage Configuration: Non-Enclosed Container Benefit Generation: By Participating in the Shandong Grid Ancillary Services Market Main Equipment Models: Batteries (180 Ah Lithium Iron Phosphate 1C Cells), PCS (1250 kW) Project Status: Connected to the Grid and Put into Operation in April 2024


Project Type: Combined Frequency Regulation with Coal-Fired Power Plant and Energy Storage Project Location: CRRC Qiaokou Power Plant Site, Chenzhou, Hunan Installed Capacity: 18 MW / 5.34 MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: By Participating in the Grid Ancillary Services Market Main Equipment Model: Batteries (21 Ah Lithium Titanate 4C) Project Status: Connected to the Grid and Put into Operation in April 2024


Project Name: Complete Set of Equipment for the 4.2 MW/1500 Vdc Energy Storage Test Platform of Jiangsu Guoyue Project Type: Charge and Discharge Testing Equipment Project Location: Liyang City, Jiangsu Province Project Scale: 4.2 MW / 1500 VDC Main Equipment Model: PCS (2000 kW High-Power, 200 kW String-Type) Project Status: Connected to the grid and put into operation in April 2024


Project Name: Ouke 1.5 MW/3 MWh Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Ouke Air Conditioning & Refrigeration Equipment Co., Ltd. Plant, Dongguan City, Guangdong Province Installed Capacity: 1.5 MW / 3 MWh Energy Storage Configuration: Non-Enclosed Container Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 3 MWh), PCS System (1523 kW) Project Status: Connected to the grid and put into operation in March 2024


Project Type: Combined Frequency Regulation with Coal-Fired Power Plant and Energy Storage Project Location: Hunan CR Power Liyujiang Co., Ltd., Zixing City, Hunan Province Installed Capacity: 12 MW / 12 MWh Energy Storage Configuration: Non-Enclosed Container Benefit Generation: By Participating in the Grid Ancillary Services Market Main Equipment Model: Batteries (180 Ah Lithium Iron Phosphate 1C Cells) Project Status: Connected to the Grid and Put into Operation in March 2024


Project Name: Taikai Hongqinghe Coal Mine 1000kW/2000kWh Energy Storage Project Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Hongqinghe Coal Mine Plant Area, Ordos City, Inner Mongolia Installed Capacity: 1MW/2MWh Energy Storage Configuration: Non-Enclosed Containerized System Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 2MWh), PCS System (2 x 500kW) Project Status: Connected to the grid and put into operation in December 2023

Beijing Yuanhe Energy Company Limited

Contact Us

010-53389198

Business Hotline: (9:00 AM–5:00 PM)

gm@yhenergy.com

Corporate Email

Image Name

Yuanhe Energy Official WeChat Account

Image Name

Official Video Account

WeChat Official Account

Download Materials

%{tishi_zhanwei}%