Project Name: Tianneng HP2 Battery Outdoor Cabinet Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Huzhou City, Zhejiang Province Installed Capacity: 500 kW / 1,000 kWh Energy Storage Configuration: Battery Outdoor Cabinets Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 5 x 215 kWh), PCS System (5 x 125 kW) Project Status: Connected to the grid and put into operation in December 2023
Project Name: Yongxing Special Steel Lithium Titanate and Lithium Iron Phosphate Energy Storage Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Yongxing Special Steel Plant Area, Huzhou City Installed Capacity: 6 MW / 6 MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate 2 MW / 4 MWh + Lithium Titanate 4 MW / 2 MWh), PCS System (5 x 1330 kW), EMS System Project Status: Connected to the grid and put into operation in December 2023
Project Name: CRRC 1200 kWh Electric Locomotive Power Battery Energy Storage Project Project Type: Hybrid Locomotive Project Location: Baotou Iron and Steel Co., Ltd., Inner Mongolia Installed Capacity: 1.2 MWh Project Format: Power Battery Management System Integration Project Status: Commissioned in December 2023
Project Name: Haopeng Technology Co., Ltd. 4 MW/7.74 MWh User-Side Distributed Energy Storage Project Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Huiyang District, Huizhou City Installed Capacity: 4 MW/7.74 MWh Energy Storage Configuration: Non-Accessible Energy Storage Container Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Model: Battery System (Lithium Iron Phosphate, 2 × 3.87 MWh) Project Status: Connected to the grid and put into operation in November 2023
Project Type: Combined Frequency Regulation with a Coal-Fired Power Plant and Energy Storage Project Location: Datang Binzhou Power Generation Co., Ltd. Plant Area, Bincheng District, Binzhou City Installed Capacity: 10 MW / 10 MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: By Participating in the Shandong Grid Ancillary Services Market Main Equipment Models: Batteries (180 Ah Lithium Iron Phosphate 1C Cells), PCS (1250 kW) Project Status: Connected to the Grid and Put into Operation in November 2023
Project Name: CRRC 774 kWh Electric Locomotive Power Battery Energy Storage Project Project Type: Hybrid Locomotive Project Location: Chongqing Installed Capacity: 0.77 MW / 0.774 MWh Project Format: Power Battery System Main Equipment Model: Batteries (280 Ah Lithium Iron Phosphate) Project Status: Delivered
Project Name: Midea Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Foshan City, Guangdong Province Installed Capacity: 1 MW / 2.15 MWh Energy Storage Configuration: Non-Enclosed Container System Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 2.15 MWh) | PCS System (2 × 500 kW) Project Status: Connected to the grid and put into operation in August 2023
Project Name: Jiaxing Xiehe User-Side Distributed Energy Storage Project Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Jiaxing City, Zhejiang Province Installed Capacity: 2.5 MW / 5 MWh Energy Storage Configuration: Non-Enclosed Container Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Battery System (Lithium Iron Phosphate, 5 MWh), PCS System (4 x 630 kW) Project Status: Connected to the grid and put into operation in July 2023
Project Name: Puyu Shidai MINI Battery Outdoor Cabinet Project Project Type: Commercial and Industrial User-Side Energy Storage Project Location: Huiyang District, Huizhou City Installed Capacity: 3 MW / 5.98 MWh Energy Storage Configuration: Battery Outdoor Cabinets Benefit Generation: Peak‑valley arbitrage through peak shaving and valley filling Main Equipment Models: Batteries (Lithium Iron Phosphate, 0.5C), PCS (100 kW) Project Status: Connected to the grid and put into operation in July 2023
Project Type: Combined Frequency Regulation with Coal-Fired Power Plant and Energy Storage Project Location: Within Huadian Laiwu Power Plant Installed Capacity: 6 MW / 0.2 MWh Energy Storage Configuration: Energy Storage Container System Benefit Generation: By Participating in the Grid Ancillary Services Market Main Equipment Model: PCS (3 MW × 2) Project Status: Connected to the grid and put into operation in June 2023
Project Name: GAC Aion New Energy Vehicle Co., Ltd. – Phase II 6.25 MW / 12.7566 MWh User-Side Distributed Energy Storage Project Project Type: Industrial and Commercial User-Side Energy Storage Project Location: Panyu District, Guangzhou City, Guangdong Province Installed Capacity: 6.25 MW / 12.756 MWh Energy Storage Configuration: Non-Access Containerized System Benefit Generation: Peak‑valley arbitrage through load shifting to reduce demand charges and lower electricity costs Main Equipment Models: Battery System (Lithium Iron Phosphate: 2 × 5.102 MWh + 2.55 MWh), PCS (2 × 2.5 MW + 1.25 MW) Project Status: June 2023
Project Name: AVIC Project Power System Project Type: Mobile Test Bench Power System Project Location: Guiyang Installed Capacity: 1 MW / 0.5 MWh Main Equipment Models: Batteries (BYD 302 Ah Lithium Iron Phosphate Cells, 0.5 MWh), PCS (2 × 500 kW) Project Status: Connected to the grid and put into operation in May 2023