  • 电网侧储能-8.webp

Datang Binzhou Power Generation Co., Ltd. Electrochemical Energy Storage Frequency Modulation Project

Delivery Date:

November 2023


Project Address:

Datan Binhai Power Generation Co., Ltd. Plant Area, Bincheng District, Binzhou City


Product used:

Yuanhe Energy provides a complete set of solutions.


Category:

Project Cases

Frequency Regulation in Thermal Power


Project Introduction


        The project is located within the Datang Binzhou Power Plant in Binzhou City, Shandong Province, with an installed capacity of 10 MW/10 MWh and utilizes 1P liquid-cooled lithium iron phosphate battery energy storage technology. The project won the bid in September 2023, commenced construction in mid-October, and shipped its equipment in early November. After less than two weeks of commissioning, it has been successfully connected to the grid and put into operation. The grid-connected operation of the Datang Binzhou Coal-Fired Power Plant Energy Storage Coordinated Frequency Modulation Project will effectively enhance the frequency modulation performance of the generating units, improve the stability and reliability of power grid operations, and provide strong support for Shandong Province’s energy transformation and development.

Download Materials


Related Products


Beijing Yuanhe Energy Company Limited

Contact Us

010-53389198

Business Hotline: (9:00 AM–5:00 PM)

gm@yhenergy.com

Corporate Email

Image Name

Yuanhe Energy Official WeChat Account

Image Name

Official Video Account

WeChat Official Account

Download Materials

%{tishi_zhanwei}%